- Start with a clean, dry surface.
- Apply a small amount of oil to the surface using a lint-free cloth or brush.
- Rub gently until it is absorbed by the raw wood or Chalk Mineral Paint.
- Allow 2 hours to dry.
- Wipe excess after 12 hours and repeat if necessary.
Dry time: 24 hours - Cure time: 21-30 days